Fauquier County, VA
Home MenuUtility Plat
A Utility Lot subdivision is the process used to create a lot for public utilities, facilities or public improvements. County approval of a Construction Plan, Infrastructure Plan, Site Plan or other plan application may be required, as well as other State or Federal approvals.
Application Requirements:
Tải game bắn cáA complete application must be submitted to Community Development to begin the County review and approval process for all Utility Lot subdivisions.
A. First Submission Minimum Requirements:
-
Land Development Application Tải game bắn cáwith original signatures of the Owner and Applicant
-
Fee Calculation Sheet Administratively Approved Subdivisions
-
Non-Residential Division/Utility Lot Checklist Tải game bắn cásigned by the Surveyor or Engineer
-
Tải game bắn cáThree (3) copies of the Utility Lot Subdivision Plat, unsigned for review purposes
-
Flash drive containing PDF copies of all submission requirements
B. Additional Information that may be required:
-
Tải game bắn cáA Deed of Subdivision and Easement Dedication.
-
Approval of the Fauquier County Water and Sanitation Authority.
-
Any necessary State or Federal approvals.
-
Construction/Infrastructure/Site Plan approval.
Signature Set submission for Approval:
Tải game bắn cáOnce the Utility Lot Subdivision Plat and all necessary documentation has been reviewed and deemed ready for approval, the Signature Set Submission must be made to the County. The Signature Set Submission must include:
-
Five (5) copies of the Plat with all required original signatures
-
Tải game bắn cáOne (1) copy of each Deed with all required original signatures
-
Tải game bắn cáFlash drive containing individual PDF copies of all re-submission materials